About Us

Reconstruction of Riga Congress Centre

On October  3rd, 2011 a project agreement was signed with architect company LLC Nams „On Riga Congress Centre reconstruction and technical draft.” Winner of the competition has to develop a technical project in 7 to 10 months.
The aim of reconstruction is to obtain solution where multifunctional hall is interconnected with recreational space and number of seats is increased to at least 1400. Premises have to be equipped with cutting edge audio and acoustic system technologies to provide the most comprehensive options for event organizing – from popular and symphonic music to speech performances (conferences, congresses). On the stage has to be enough space for full size symphonic orchestra (at least 120 performers) and choir (at least 100 performers) performing together.
During reconstruction of Riga Congress Centre it is planned to retain the facade and main elements of the interior.
After approval of the technical project it is planned to finish the reconstruction till 2016. Reconstruction project will be financed from LLC Rīgas Nami funds.



– Print document